- Details
- Category: MTech Power Electronics Projects
- By MTech Projects
- Hits: 1
Arm Balancing Control and Experimental Validation of a Grid Connected MMC with Pulsed DC load - 2017
PROJECT TITLE :
Arm Balancing Control and Experimental Validation of a Grid Connected MMC with Pulsed DC load - 2017
ABSTRACT:
This paper focuses on the operation of a grid-connected modular multilevel converter (MMC) supplying a pulsed dc load. The goal is to realize minimum ac power fluctuation despite the high power fluctuation present on the dc aspect. The MMC has been selected for its inherent ability to decouple ac and dc current controllers. But, if no additional provisions are taken, the pulsed load causes imbalance of cell capacitor voltages between higher and lower arms in every part. This paper presents the theoretical analysis of the imbalance drawback and proposes a easy arm-balancing controller to enable the operation of the converter beneath pulsed dc load. The effectiveness of the controller has been successfully verified on a seven kW MMC experimental prototype with a 3 kA pulsed dc load.
Did you like this research project?
To get this research project Guidelines, Training and Code... Click Here


